Local ADU (accessory dwelling unit) pros in 65 Los Angeles-area neighborhoods. Each request goes to up to four of them.
An ADU, or accessory dwelling unit, is a second home on a single-family lot: a detached backyard unit, a garage conversion, an attached addition or a junior unit carved from existing space. In Greater Los Angeles, ADUs are among the most common residential projects, built for rental income, family members or a home office. In Greater San Antonio they are less common but growing, often as a backyard cottage for parents or grown children. We connect you with builders and design-build firms that work on ADUs.
Most ADU projects move through feasibility, design, permitting and construction. Feasibility checks setbacks, utilities, sewer capacity, easements and slope. Design produces architectural and structural plans, along with Title 24 energy reports in California. Construction then runs through foundation, framing, rough plumbing and electrical, inspections, insulation, drywall, finishes and final. Prefab and modular units shorten site work but still need foundations and utility hookups. Garage conversions often go from plans to move-in in three to five months; a detached new build often takes eight to fourteen months including design and permits.
Site conditions in each metro shape the cost. In LA, hillside lots may need engineered foundations and soils reports, expansive Valley clay can require deeper footings, and fire hazard zones bring material and access requirements. Many older lots have narrow side yards that make deliveries hard, and sewer laterals from the 1940s may need replacing to serve a second unit. Service upgrades with LADWP, SoCal Edison or the city utility in places like Pasadena and Burbank can take months. In San Antonio, slab foundations on clay need careful engineering, and deed restrictions in some subdivisions limit what is allowed.
California state law has pushed cities to approve ADUs on most single-family lots, set time limits for decisions on complete applications and reduced parking and some fees for smaller units, though the details change often. LADBS, LA County and cities like Glendale or San Marino each apply these rules in their own way, and some offer preapproved plans, so ask what your jurisdiction has. In San Antonio, DSD reviews ADUs under the city's development code, with limits on size and use. Expect plan check corrections, several inspections and utility coordination before the final.
| Job | Typical range | What moves the price |
|---|---|---|
| Garage conversion | $80,000 - $180,000 | Slab condition, plumbing runs to the sewer, insulation and adding windows or an entry door. |
| Detached ADU, new build | $250 - $450 / sq ft | Lot access, foundation type, finishes and how far utilities must run from the street. |
| Prefab or modular ADU | $200 - $400 / sq ft | The unit price plus foundation, crane delivery, utility hookups and site preparation. |
| Junior ADU inside the house | $40,000 - $100,000 | Converting a bedroom or suite with a small kitchen; plumbing access drives most of the cost. |
| Design, engineering and permits | $15,000 - $45,000 | Plans, structural and energy reports, plan check and city fees; hillside lots add soils reports. |
| Utility and sewer upgrades | $5,000 - $40,000 | A new electrical service, sewer lateral or water line can become a major line item. |
Typical market ranges, not a quote. Your price depends on the house, the scope and the season; compare written quotes.
Published Los Angeles ADU costs and the state fee and timeline rules for ADUs are collected in our Los Angeles Home Remodeling Costs 2026 guide, with a source for every number.
Type your ZIP code and we take you to the adu (accessory dwelling unit) page for your neighborhood. If we do not cover that ZIP yet, you go to the request form with it filled in.
We also match ADU (accessory dwelling unit) requests in 5 San Antonio neighborhoods.
Detached ADUs in Los Angeles commonly run about $250 to $450 per square foot for construction, with design, permits and utility work on top. A 600 square foot unit might total roughly $180,000 to $300,000. Garage conversions usually cost less. Hillside lots, long utility runs and premium finishes push costs up.
Generally yes on many single-family lots, under the city's development code administered by DSD, with rules on size, setbacks and use. Deed restrictions and HOA rules in some subdivisions may limit or bar them. Check your plat and HOA documents, and ask DSD or a designer to confirm before you commit.
From first design meeting to move-in, a detached ADU often takes eight to fourteen months, with design and permits taking three to six months of that. Garage conversions can move faster. Delays commonly come from plan check corrections, utility service upgrades and inspection scheduling.
Not always. Many ADUs share the main house electrical and water service, which can call for a larger panel or service. Separate meters cost more but make billing tenants simpler. Rules and fees vary by utility, so ask your builder to check with LADWP, SoCal Edison, your city utility, or CPS Energy and SAWS.
In California, adding an ADU typically leads to reassessment of the new construction only, not the whole property, though details vary. In Texas, the appraisal district may raise your home's value after the unit is built. Ask a tax professional or your county assessor for an estimate before you build.
A garage conversion often costs less and moves faster because the foundation and structure exist, though old slabs and framing may need upgrades. A detached new build gives more design freedom and can be larger. Lot size, garage condition and parking needs usually decide which path makes sense.