Local kitchen remodeling pros in 64 Los Angeles-area neighborhoods. Each request goes to up to four of them.
Kitchen remodeling ranges from new countertops and cabinet fronts to gutting the room down to the studs, moving walls and rerouting plumbing, gas and electrical. In Greater Los Angeles, many projects open up the closed kitchens of 1920s to 1960s houses or redo dated 1980s remodels. In Greater San Antonio, homeowners often want more storage, a larger island and better ventilation in tract homes built from the 1970s onward. We share your project with kitchen remodelers working in your neighborhood.
A full remodel follows a set order: design and selections, permits, demolition, framing changes, rough plumbing, electrical and venting, inspections, insulation and drywall, then cabinets, countertop templating, tile, fixtures and appliances. Countertop fabrication usually waits until the cabinets are set, which adds one to three weeks in the middle. Cabinet lead times often decide the schedule more than labor does. A cosmetic refresh may take two to four weeks; a gut remodel commonly takes eight to sixteen weeks once permits are issued, longer if walls move or a beam goes in.
Older houses add surprises. In 1920s to 1950s Los Angeles homes, walls often hide galvanized water pipe, ungrounded wiring or knob-and-tube, and plaster that is harder to patch than drywall. Taking out a wall over a raised foundation can mean a new beam with posts and footings below, and hillside homes may need an engineer for structural changes. An induction range or heat pump water heater may require a panel upgrade. In San Antonio, slab foundations on expansive clay make moving a sink harder, since drains run through the slab, and long hot summers argue for a strong range hood.
Most kitchen remodels beyond cosmetic work need permits. LADBS, LA County Public Works, separate cities like Glendale and Pasadena, and San Antonio DSD typically require building, electrical and plumbing permits when you move fixtures, add circuits or change walls. California's Title 24 sets lighting and some ventilation rules for remodeled kitchens, so ask your designer how they apply to your plan. Expect several inspections. You will usually be without a working kitchen for weeks, so set up a temporary station with a microwave, the refrigerator and a nearby sink.
| Job | Typical range | What moves the price |
|---|---|---|
| Cosmetic refresh: paint, hardware, counters | $15,000 - $35,000 | Countertop material and whether the cabinets are refaced, painted or kept as they are. |
| Mid-range remodel, same layout | $40,000 - $80,000 | Semi-custom cabinets, quartz counters and new appliances, with plumbing left where it is. |
| Full remodel with layout changes | $80,000 - $160,000 | Moving walls, plumbing and gas, plus custom cabinets and higher-end finishes throughout. |
| Custom cabinets | $15,000 - $50,000 | Box construction, door style, finish and how many specialty inserts and drawers you choose. |
| Electrical panel upgrade | $2,500 - $6,000 | Needed in many older homes for induction cooking and added circuits; utility scheduling adds time. |
| Removing a load-bearing wall | $5,000 - $20,000 | Beam size, engineering, posts and footings, plus patching floors and ceilings afterward. |
Typical market ranges, not a quote. Your price depends on the house, the scope and the season; compare written quotes.
Published Los Angeles figures for minor and major kitchen remodels, LADBS permit fees and Title 24 rules are collected in our Los Angeles Home Remodeling Costs 2026 guide, with a source for every number. For kitchen work specifically, see Los Angeles Kitchen Remodel Costs & Permits 2026: cost tiers, which work needs an LADBS permit, and wait times from the city's own permit records.
Type your ZIP code and we take you to the kitchen remodeling page for your neighborhood. If we do not cover that ZIP yet, you go to the request form with it filled in.
We also match kitchen remodeling requests in 5 San Antonio neighborhoods.
In Los Angeles, a mid-range remodel that keeps the layout often runs about $40,000 to $80,000, and full layout changes with custom cabinets commonly pass $100,000. San Antonio prices tend to run somewhat lower for similar scope. Cabinets, countertops and moving plumbing or walls create the biggest swings in cost.
Replacing countertops or cabinets in the same spot often does not. Moving plumbing, adding circuits, changing gas lines or removing walls usually does. These permits come from LADBS, from the city itself in places like Burbank, from LA County for unincorporated addresses, or from San Antonio DSD. A good contractor lists the permits that apply right in the bid.
A cosmetic update can be done in two to four weeks. A full remodel commonly takes eight to sixteen weeks after permits, with cabinet lead times and countertop fabrication driving much of the schedule. Older homes may need extra time when inspections uncover old wiring or plumbing that has to be replaced.
Many homeowners get the most from well-built cabinets with solid drawer hardware, durable counters and a strong range hood. Layout matters more than finishes for daily use. You can save with standard cabinet sizes and mid-range appliances, then upgrade the pieces your hands touch every day.
If the boxes are solid plywood and the layout works, refacing or painting them can save a lot. Many 1950s and 1960s cabinets in LA homes are sturdy but dated. Water-damaged sink bases and particleboard cabinets from later remodels are usually better replaced. A contractor can check the boxes before you decide.
Late fall through winter is often slower for remodelers, which can make scheduling easier. Start design and permits two to four months before you want construction to begin. Avoid planning demolition right before a holiday you want to host, because delays do happen.