What a bathroom remodel costs in Los Angeles, which work needs a city permit, and how long LADBS takes to issue one, with a public source for every number.
NerdWallet puts the average Los Angeles bathroom remodel at about $20,000, and the 2025 Cost vs. Value Report prices a midrange bathroom remodel in Los Angeles at $27,143 and an upscale one at $85,055. A remodel with no structural changes qualifies for an LADBS Express Permit, which needs no plan check, and 83.5% of the 2,970 bathroom remodel permits LADBS issued from November 2025 through October 2026 were Express Permits. For permits that did go through plan check, the median wait from submittal to issue was 21 days.[1][2][4][3]
Two kinds of figures are published for Los Angeles. NerdWallet reports an average of what homeowners paid. Remodeling's Cost vs. Value Report prices one defined model project for each tier, so its numbers describe a specific scope rather than an average. The LADBS figure is the value owners declared on their permits, which is not a price. All three are shown so you can see the spread.
| Project | Los Angeles figure | What it measures | Source |
|---|---|---|---|
| Bathroom remodel, average | about $20,000 | Average reported cost in Los Angeles | NerdWallet[1] |
| Bath remodel, midrange | $27,143 | One defined midrange project | Cost vs. Value 2025[2] |
| Bath remodel, universal design (accessible) | $44,580 | One defined accessibility project | Cost vs. Value 2025[2] |
| Bath remodel, upscale | $85,055 | One defined upscale project | Cost vs. Value 2025[2] |
| Bathroom addition, midrange | $63,595 | Adding a new bathroom | Cost vs. Value 2025[2] |
| Bathroom addition, upscale | $119,034 | Adding a new bathroom | Cost vs. Value 2025[2] |
| Declared value on LADBS bathroom remodel permits | $14,000 median | Value stated on 2,934 permit applications, November 2025 through October 2026; middle half $8,000 to $30,000. Not a price. | LADBS open data[3] |
These are published figures, not quotes. Your price depends on the house, the scope, the finishes and the site. We found no reliable published figure for how a remodel's cost changes from one Los Angeles neighborhood to the next, so we do not show one.
The same report estimates the value each project adds when the house sells. In Los Angeles, the midrange bath remodel shows a resale value of $24,312, or 89.6% of its cost; the universal-design remodel shows a resale value of $25,480, or 57.2% of its cost; and the upscale remodel shows a resale value of $35,982, or 42.3% of its cost.[2] These are estimates, not a promise of what a buyer will pay.
Inside the City of Los Angeles, building permits come from the Los Angeles Department of Building and Safety (LADBS). Cities such as Pasadena, Glendale, Burbank and Santa Monica, and unincorporated LA County, run their own permit offices and are not covered by the figures on this page.
Not sure whether your plan has a structural change? Ask the contractor to say in the written estimate which permits they will pull, and who pulls them.
LADBS issued 2,970 bathroom remodel permits for one- and two-family homes from November 2025 through October 2026. 83.5% were Express Permits, which the data lists without a submittal date, so they are not in the wait times below. For the 490 plan-check permits with both dates, the median wait from submittal to issue was 21 days, and the middle half took 2 days to 59 days. 59.4% were issued within 30 days.[3]
| Permit route (LADBS business unit) | Permits | Median wait | Middle half | Median declared value |
|---|---|---|---|---|
| Express Permit (no plan check) | 2,479 | no submittal date in the data | $12,000 | |
| Plan check at the counter | 347 | 10 days | 0 days to 32 days | $18,000 |
| Expanded counter plan check | 120 | 55.5 days | 26 days to 91 days | $45,000 |
| Regular plan check | 24 | 128.5 days | 72 days to 176 days | $62,500 |
Wait = calendar days from the submittal date to the issue date, as published in the LADBS dataset. It measures the permit office, not how long construction takes.
28.9% of the bathroom remodel permits (857) were in the city's Hillside Ordinance areas. For those that went through plan check, the median wait was 25 days (123 permits), against 19 days elsewhere (367 permits). The median declared value was $17,145 on hillside lots and $12,000 elsewhere.[3]
| Month | Bathroom remodel permits issued |
|---|---|
| November 2025 | 184 |
| December 2025 | 210 |
| January 2026 | 234 |
| February 2026 | 209 |
| March 2026 | 259 |
| April 2026 | 287 |
| May 2026 | 267 |
| June 2026 | 258 |
| July 2026 | 257 |
| August 2026 | 299 |
| September 2026 | 251 |
| October 2026 | 255 |
The ten ZIP codes with the most bathroom remodel permits, November 2025 through October 2026. Medians are shown only where at least 10 permits list both dates (wait) or 15 list a value (declared value). ZIP codes can cross neighborhood and city lines; the data covers only the part inside the City of Los Angeles.[3]
| ZIP code | Our neighborhood page | Permits | Median wait (plan check) | Median declared value |
|---|---|---|---|---|
| 91344 | Granada Hills | 78 | 2 days | $10,000 |
| 90272 | Pacific Palisades | 75 | 19.5 days | $38,100 |
| 91367 | Woodland Hills | 74 | 9 days | $11,250 |
| 90045 | Westchester | 74 | 17 days | $16,000 |
| 91364 | Woodland Hills | 71 | 0 days | $10,000 |
| 90049 | Brentwood | 71 | 41 days | $35,000 |
| 90042 | Highland Park | 70 | 18 days | $15,000 |
| 90065 | Mount Washington | 63 | too few dates | $13,660 |
| 90068 | Hollywood Hills | 62 | 84 days | $15,000 |
| 90066 | Mar Vista | 56 | too few dates | $13,750 |
We did not find a reliable published figure for how long construction itself takes in Los Angeles, so we do not give one. Ask each contractor for a written schedule.
NerdWallet puts the average LA bathroom remodel at about $20,000. The 2025 Cost vs. Value Report prices these Los Angeles projects: bath remodel, midrange, $27,143; bath remodel, universal design (accessible), $44,580; bath remodel, upscale, $85,055. The sources measure different things, so treat them as a range, not a quote.
Inside the City of Los Angeles, LADBS issues the permits. Its Express Permit bulletin lists a kitchen or bathroom remodel for residential buildings with no structural changes as Express Permit work, along with replacing or adding plumbing fixtures and replacing water heaters. Work that needs plan review, such as structural changes, goes through plan check. Cities such as Pasadena, Glendale and Burbank, and unincorporated LA County, run their own permit offices.
83.5% of the 2,970 bathroom remodel permits LADBS issued from November 2025 through October 2026 were Express Permits, which need no plan check. For the 490 permits that went through plan check and list both dates, the median wait from submittal to issue was 21 days, and the middle half took 2 days to 59 days.
In the city's data, bathroom remodel permits in Hillside Ordinance areas that went through plan check had a median wait of 25 days (123 permits), against 19 days elsewhere (367 permits).
Under California law, as the Contractors State License Board explains, a down payment on a home improvement job cannot be more than $1,000 or 10 percent of the contract price, whichever is less.
It is the job value the applicant states on the permit application. For bathroom remodel permits issued from November 2025 through October 2026, the median was $14,000 and the middle half fell between $8,000 and $30,000. It is not a contractor bid or a final cost.
Tell us how to reach you and your ZIP code. We pass your request to local bathroom remodelers who take this kind of work, and they contact you to talk through the job. There is no charge to you, and you decide whether to hire anyone.
Prefer to read about your area first? Pick your neighborhood below.
More data: LADBS kitchen and bath permit data · Los Angeles home remodeling costs 2026
Journalists, real estate agents, bloggers and researchers are welcome to quote the figures on this page. Please link to this guide and credit the original sources listed below.
Figures were checked against these sources on November 23, 2026.